During the last week Chandra completed the observing schedule as planned. Chandra passed through the fifteenth and sixteenth eclipses of the season on Apr 22 and 24 respectively, with nominal power and thermal performance. A real-time procedure was executed on Apr 26 to update the on-board ephemeris. The schedule of targets for the next week is shown below and includes an observation of Swift J1753.5-0127, which was accepted as Director's Discretionary Time TOO on Apr 26, an observation of Sgr A* coordinated with several ground-based observatories, and observations of SDSS J131659.37+035319.8 and SDSS J132428.24+044629.6 coordinated with the EVLA. |
------------------------------------------
Radiation Belts Apr 30 PSS1326+0743 ACIS-S SDSSJ1554+1937 ACIS-S SgrA* ACIS-S/HETG PSRJ1628-32 ACIS-S May 2 Radiation Belts May 3 SDSSJ131659.37+0353 ACIS-S SDSSJ1503+3641 ACIS-S G115.71+17.52 ACIS-I SwiftJ1753.5-0127 ACIS-S/HETG SDSSJ1509+2432 ACIS-S SDSSJ132428.24+0446 ACIS-S SDSSJ1608+0715 ACIS-S May 4 SN1006SW ACIS-I Radiation Belts May 5 SDSSJ1524+2123 ACIS-S CasACCO ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports