News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 4 January 2013 9.00am EST

During the last two weeks Chandra completed the observing schedule as planned.

A real-time procedure was executed on Jan 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes observations of the Crab and 3C 111 coordinated with HST.



------------------------------------------
Radiation Belts                     Jan  6
         DeepField07            ACIS-I
         DeepField08            ACIS-I       Jan  7
         COSMOSLegacy           ACIS-I
         NGC2940                ACIS-S       Jan  8
         ESO323-024             ACIS-S
         Radiation Belts                     Jan  9
         PSRJ0358+5413          ACIS-I
         3C111                  ACIS-S       Jan 10
         Radiation Belts                     Jan 11
         RWAur                  ACIS-S       Jan 12
         Crab                   ACIS-S
         4U0728-25              ACIS-S
         E0102-72S3             ACIS-S
         SDSSJ1447-0203         ACIS-S       Jan 13
         SDSSJ094032.25+3113    ACIS-S
         SDSSJ123915.40+5314    ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.