News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 11 January 2013 9.00am EST

During the last two weeks Chandra completed the observing schedule as planned.

A real-time procedure was executed on Jan 8 to uplink a flight software patch that makes the temperature of the Integral Propulsion System fuel tank and tank heater status available to the on-board computer. These data are for planned use in future flight software patches for management of the tank temperature. Additional real-time procedures were executed on Jan 8 to dump OBC-A memory as a follow-up to the flight software patch. The dump will be used to update the baseline memory image maintained on the ground.

A Chandra press release was issued on Jan 7 as a NASA press release describing Chandra observations of the Vela pulsar jet. A new Chandra movie of the Vela pulsar (created from eight images from observations between June and September 2010) shows it may be "precessing," or wobbling as it spins. For details see: http://chandra.si.edu/press/13_releases/press_010713.html

Of note this week was the release on Jan 8 of CALDB 4.5.5.1. This update is a minor patch upgrade that corrects header keyword omissions in the new ACIS time-dependent QEU files originally released in CALDB 4.5.5.

The schedule of targets for the next week is shown below and includes an observation of 2MASS J19094043+4930050 coordinated with Kepler.



------------------------------------------
 Mrk709                 ACIS-S       Jan 13
         SDSSJ100654.20+4647    ACIS-S       Jan 14
         Radiation Belts
         SPT-CLJ0212-4656       ACIS-I
         SPT-CLJ2335-4544       ACIS-I       Jan 15
         A2597                  ACIS-I
         DeepField04            ACIS-I
         SwiftJ1626.6-5156      ACIS-S
         COSMOSLegacy           ACIS-I       Jan 16
         3c244.1                ACIS-S
         J1009+2656             ACIS-S
         Radiation Belts                     Jan 17
         SPT-CLJ0417-4748       ACIS-I
         DeepField09            ACIS-I
         J1741+6526             ACIS-S       Jan 18
         DeepField10            ACIS-I
         SPT-CLJ0033-6326       ACIS-I
         IRASF16164-0746        ACIS-S       Jan 19
         IC563/4                ACIS-S
         Radiation Belts
         SPT-CLJ0304-4401       ACIS-I
         2MASSJ19094043+4930    ACIS-S       Jan 20

------------------------------------------

All spacecraft subsystems continued to support nominal operations.