News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 22 February 2013 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Feb 15 to re-initialize the flight software Thruster Command Processing subfunction in order to prevent the occurrence of an overflow condition.

Preparations are complete for the winter 2013 eclipse season; the season contains 14 eclipses and runs from Feb 17 to Mar 24. Real-time procedures were executed on Feb 16 to prepare for the first eclipse: one to activate SCS 29 and one to dump and clear the EPS glitch counters. Chandra passed through the first and second eclipses of the season Feb 17 and 20, with nominal power and thermal performance.

The schedule of targets for the next week is shown below and includes an observation of a M 82 transient, which was accepted as a Director's Discretionary Time TOO on Feb 11, and an observation of the Crab coordinated with HST.



------------------------------------------
         M82transient           ACIS-S       Feb 24
         SDSSJ0908+2852         ACIS-S       Feb 25
         Crab                   ACIS-S
         3C216                  ACIS-S
         SDSSJ095306.81+3650    ACIS-S
         3C343.1                ACIS-S
         Radiation Belts
         G333.3-0.4             ACIS-I       Feb 26
         3C286                  ACIS-S
         CODEX58014             ACIS-I
         hrc-5                  HRC-I
         WASP-18                ACIS-I
         Z1665                  ACIS-I       Feb 27
         SDSSJ0849+1114         ACIS-S       Feb 28
         Radiation Belts
         G333.3-0.4             ACIS-I
         HE1104-1805            ACIS-S       Mar  1
         SDSSJ1005+3312         ACIS-S
         SDSS1004+4112          ACIS-S
         M31Southeast           ACIS-S/HETG
         ESO521-39              ACIS-S       Mar  2
         Radiation Belts
         PSRJ2139+4716          ACIS-S       Mar  3
         3C336                  ACIS-S
         LSE263                 HRC-I
         G275.21+43.92          ACIS-I
         CODEX57892             ACIS-I
         V1309Sco               ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports