Friday 23 August 2013 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Chandra passed through the eleventh, twelfth, and thirteenth eclipses of the season on Aug 16, 19, and 21 respectively, with nominal power and thermal performance. A real-time procedure was executed on Aug 19 to perform a check-out of the B-side MUPS thrusters. The goal of the check-out was to clear the suspected gas bubbles from the lines feeding the thrusters on the hot side of the spacecraft, which had exhibited reduced thrust during the Aug 3 checkout. The two cold-side thrusters continued to perform at nominal thrust and one of the hot-side thrusters performed at nominal thrust by the end of the checkout. However, the second hot-side thruster, MUPS-B2, showed no thrust after after multiple firings. The cause for the lack of thrust on MUPS-B2 is under investigation. A flight software patch was uplinked on Aug 21 that will keep MUPS-A active for use in the case of a Safe Mode entry, avoiding the uncontrolled use of MUPS-B2. Of note this week was the release on Aug 22 of CALDB 4.5.8. This update includes ACIS time-dependent gain corrections for the period May-July 2013. For details see: http://cxc.harvard.edu/caldb/downloads/Release_notes/CALDB_v4.5.8.html The schedule of targets for the next week is shown below |
------------------------------------------
PSRJ1044-5737 ACIS-I Aug 25 PSRJ0633+1746 ACIS-I 3C147 ACIS-S Aug 26 Q2237+0305 ACIS-S M31BHXN ACIS-I DeepField06 ACIS-I Radiation Belts Aug 27 AM0642-801 ACIS-S ESO455-33 ACIS-S HAE220 ACIS-S Aug 28 PSRJ0633+1746 ACIS-I CODEX12451 ACIS-I Q2237+0305 ACIS-S SDSSJ083803.67+5406 ACIS-S Aug 29 A2110 ACIS-I betaDor ACIS-I Radiation Belts SMCDeepField01 ACIS-I Aug 30 PSRJ0633+1746 ACIS-I A665 ACIS-I Aug 31 Q2237+0305 ACIS-S 3C49 ACIS-S SgrA* ACIS-S SMCDeepField01 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports