News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 20 September 2013 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A flight software patch was uplinked on Sep 19 that disables the capability for the MUPS-B2 thruster firing, to prevent the risk of a stuck open thruster. Real-time procedures were executed on Sep 19 and 20 to dump OBC-A memory as a follow-up to the patches. The dump will be used to update the baseline memory image maintained on the ground.

A real-time procedure was used to monitor the momentum unload that was executed from the on-board command loads on Sep 17; the unload performance was nominal.

A Chandra image release was issued on Sep 19 describing observations of the Coma cluster of galaxies. Galaxies clusters are the largest structures in the Universe held together by gravity. Long arms of hot gas been discovered in the Coma cluster of galaxies; these arms span at least a half a million light years. These arms were likely formed by hot gas being stripped and left behind smaller clusters of galaxies as they merged with Coma. For details see: http://chandra.si.edu/photo/2013/coma/

The schedule of targets for the next week is shown below and includes observations of SDSS J0908+4441 and SDSS J2222-0946 coordinated with the Hobby-Eberly Telescope.



------------------------------------------
        Radiation Belts                     Sep 22
        G062.42-46.41          ACIS-I
        IGRJ17091-3624         ACIS-S/HETG  Sep 23
        SDSSJ0908+4441         ACIS-S
        TCha                   ACIS-S/HETG
        SwiftJ132150.9-6333    ACIS-S       Sep 24
        Radiation Belts                     Sep 25
        DeepField11            ACIS-I
        GJ3253                 ACIS-S
        G171.94-40.65          ACIS-I       Sep 26
        XMM01                  ACIS-S
        SDSSJ2222-0946         ACIS-S       Sep 27
        M31BHXN                ACIS-I
        SuzakuJ2226+6047       ACIS-S
        Radiation Belts
        SN1987A                ACIS-S/HETG  Sep 28
        BD+371977              HRC-I        Sep 29
        SN2008en               ACIS-S
        G062.42-46.41          ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports