News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 3 April 2015 9.00am EDT

During the last week the observing schedule was replanned to incorporate an observation of GK Persei, which was accepted as a Director's Discretionary Time Target of Opportunity on Mar 29. Loads for the replanned schedule will be uplinked later today. Scheduled observations of 2MASX J03534246+3714 and IRAS04124-0803 were impacted by the replan and will be rescheduled in future weeks.

An aspect camera dark current calibration was performed from the on-board loads on Mar 31 - Apr 1. An assessment of the data indicates nominal aspect camera performance and that the number of CCD warm pixels is increasing at the expected rate.

A real-time procedure was executed on Apr 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next two weeks is shown below and includes an observation of GRB 150314A, which is a Target of Opportunity follow-up accepted on Mar 19, an observation of RW Aur, which was accepted as a Director's Discretionary Time TOO on Mar 20, observations of the Crab and PG 1211+143 coordinated with HST and an observation of SDSS J1522+0327 coordinated with ground-based observatories.



------------------------------------------
        Radiation Belts                     Apr  6
        A1795                  ACIS-S
        SwiftJ1644+57          ACIS-S
        A1795                  ACIS-I       Apr  7
        BRC2                   ACIS-I
        A1795 (7 obs)          ACIS-I
        Radiation Belts                     Apr  8
        PG1211+143             ACIS-S/HETG  Apr  9
        Crab                   ACIS-S       Apr 10
        PG1211+143             ACIS-S/HETG
        A1795                  ACIS-S       Apr 11
        Radiation Belts
        SDSSJ1522+0327         ACIS-S       Apr 12
        PG1211+143             ACIS-S/HETG
        GRB150314A             ACIS-S       Apr 13
        PG1211+143             ACIS-S/HETG
        Radiation Belts                     Apr 14
        SgrA*                  ACIS-S
        SDSSJ080934.64+2548    ACIS-S
        A1795                  ACIS-I       Apr 15
        PG1211+143             ACIS-S/HETG
        A1795                  ACIS-S       Apr 16
        RWAur                  ACIS-S
        Radiation Belts
        PG1211+143             ACIS-S/HETG  Apr 17
        A1795 (3 obs)          ACIS-I       Apr 18
        1928+738               ACIS-S
        Radiation Belts                     Apr 19

------------------------------------------

All spacecraft subsystems continued to support nominal operations.