News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 29 May 2015 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on May 26 to patch the on-board computer flight software to allow simultaneous commanding of MUPS-A and MUPS-B thrusters for OBC-controlled momentum unloads. Chandra is now configured to use a mixture of MUPS-A and MUPS-B thrusters during normal operations. This improves the reliability of the OBC autonomous safing system. Real-time procedures were executed on May 26 and 27 to dump OBC-A and OBC-B memory as a follow-up to the patches. The dumps will be used to update the baseline memory images maintained on the ground.

A Chandra press release was issued on May 28 describing results from a study to better understand the nature of space and time. Using observations from Chandra, Fermi, and VERITAS of some of the most distant objects in the Universe, the results set limits on the quantum nature, or foaminess of space-time at extremely tiny scales. For details see: http://chandra.harvard.edu/press/15_releases/press_052815.html

The observing schedule for next week includes an observation of SNhunt275, which was accepted as a Director's Discretionary Time Target of Opportunity on May 26. The schedule, with a planned start of Jun 1, is still in work.





All spacecraft subsystems continued to support nominal operations.