CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 5 June 2015 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Jun 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. Of note this week was the release on Jun 2 of CXCDS 10.4 for standard processing, which includes migration of database servers from Solaris to Linux and support for a planned flight software patch to add diagnostic capability to telemetry format 6. The schedule of targets for the next week is shown below and includes an observation of SNhunt275, which was accepted as a Director's Discretionary Time Target of Opportunity on May 26. |
------------------------------------------
SNhunt275 ACIS-S Jun 8 30Doradus ACIS-I Radiation Belts RXCJ1504.1-0248 ACIS-I Jun 9 NGC5044 ACIS-S RXCJ1504.1-0248 ACIS-I Jun 10 Radiation Belts Jun 11 Kes73 ACIS-S SDSSJ1521+0102 ACIS-S Jun 12 RCW38 ACIS-I Mrk1216 ACIS-S Jun 13 NGC2442 ACIS-I Radiation Belts NGC2442 ACIS-I Jun 14 TrianglumAustralis ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports