News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 30 October 2015 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Of note this week was the Einstein Fellows Symposium held in Cambridge MA on Oct 27-28. Presentations were made by 32 current Fellows, covering a wide range of topics in observational and theoretical astrophysics research.

The schedule of targets for the next two weeks is shown below and includes an observation of SMC X-2, which was accepted as a Director's Discretionary Time Target of Opportunity on Oct 1, observations of V5668 Sgr and ASASSN-15lh, which were accepted as a Targets of Opportunity on Oct 5 and 19 respectively, an observation of the Crab coordinated with HST, an observation of M28 coordinated with NRAO-GBT, an observation of SDSS J1724+3135 coordinated with ground-based observatories, and an observation of IRAS 03219+4031 coordinated with NuSTAR.



------------------------------------------
        Bootesmoddepth1 (3 obs)ACIS-I       Nov  2
        Bootesmoddepth2        ACIS-I
        3c9                    ACIS-S
        Bootesmoddepth2 (3 obs)ACIS-I
        Bootesmoddepth3        ACIS-I       Nov  3
        3c9                    ACIS-S
        Bootesmoddepth3 (3 obs)ACIS-I
        Radiation Belts
        3c9                    ACIS-S       Nov  4
        Bootesmoddepth4 (4 obs)ACIS-I
        Abell1367              ACIS-I       Nov  5
        DragonfishAssociati    ACIS-I
        SMCX-2                 HRC-S
        ZwCl2341.1+0000        ACIS-I
        IRAS03219+4031         ACIS-S       Nov  6
        Crab                   ACIS-S
        Radiation Belts
        NGC1399                ACIS-S
        MOOJ0105+1323          ACIS-I       Nov  7
        M28                    ACIS-S
        30Doradus              ACIS-I       Nov  8
        3FGLJ0502.6+1759       ACIS-I
        Abell1367              ACIS-I
        Radiation Belts                     Nov  9
        DragonfishAssociati    ACIS-I
        NGC3773                ACIS-S       Nov 10
        G296.5+10.0-SE         ACIS-I
        30Doradus              ACIS-I
        NGC1232                ACIS-I
        RXJ0420.0-5022         ACIS-S       Nov 11
        Radiation Belts
        ASASSN-15lh            ACIS-S       Nov 12
        DragonfishAssociati    ACIS-I
        V5668Sgr               HRC-S/LETG
        PSS0133+0400           ACIS-S       Nov 13
        HAT-P-11               ACIS-S       Nov 14
        LP347-5                ACIS-S
        Radiation Belts
        Abell1367              ACIS-I
        SDSSJ1724+3135         ACIS-S       Nov 15
        ZwCl2341.1+0000        ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports