News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 6 May 2016 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

An aspect camera dark (ACA) current calibration was performed from the on-board loads on May 4. An assessment of the data is underway.

A real-time procedure was executed on May 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was executed on May 5 to disable the multiple stars suspected filter in the ACA Data Processing subfunction running in the on-board computer. A recent change has mission operations conducted with the filter disabled at all times but commanding associated with the ACA dark current measurement re-enabled the filter.

The schedule of targets for the next week is shown below and includes observations of 2MASS J13413291+0805048 and SDSS J1556+1124 coordinated with ground-based observatories and an observation of ESO 509-G038 coordinated with NuSTAR



------------------------------------------
        Radiation Belts                     May 10
        Abell2028              ACIS-S
        CygnusA-NWSubclu       ACIS-I
        GC-GBinterfac (11 obs) ACIS-I       May 11
        SDSSJ1556+1124         ACIS-S
        CygnusA-NWSubclu       ACIS-I
        Abell2028              ACIS-S
        Radiation Belts                     May 12
        LBQS1443+0141          ACIS-S
        PMNJ1603-4904          ACIS-I
        2MASSJ13413291+0805    ACIS-S       May 13
        BootesCy17-1           ACIS-I
        Tol1247-232            ACIS-S
        SPT-CLJ0313-5334       ACIS-I
        ESO509-G038            ACIS-S
        BootesCy17-1           ACIS-I       May 14
        Tol1247-232            ACIS-S
        SPT-CLJ0313-5334       ACIS-I
        Radiation Belts                     May 15
        Mkn1498                ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports