News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 16 September 2016 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Sep 9 to uplink stored command sequences needed for a special activity on Sep 13 to warm the Aspect Camera Assembly CCD while pointing at the Pleiades constellation. This is intended to anneal radiation damage in the CCD. A second real-time procedure was executed during the annealing activity on Sep 13 to raise the CCD temperature from +15 C to +20 C to enhance the annealing effect.

A Chandra press release was issued on Sep 14 describing the first detection of X-rays from Pluto. Since Pluto is cold, rocky, and without a magnetic field, it has no natural mechanism for emitting X-rays. In conjunction with data from the flyby of NASA's New Horizon spacecraft showing that Pluto's atmosphere is quite stable, the detection represents an interesting challenge to understand. For details see: http://chandra.harvard.edu/press/16_releases/press_091416.html

The schedule of targets for the next week is shown below.



------------------------------------------
        Radiation Belts                     Sep 19
        SNR1987A               ACIS-S/HETG
        PSZ2_G278.79+08.54     ACIS-I
        CentaurusA             ACIS-I       Sep 20
        MCG-03-58-007          ACIS-S
        ArLac (21 obs)         HRC-I        Sep 21
        Mkn876                 ACIS-S/HETG
        Radiation Belts
        IDCSJ1433.2+3306       ACIS-I
        ArLac (5 obs)          HRC-S        Sep 22
        PSOJ334                ACIS-S
        ArLac (16 obs)         HRC-S        Sep 23
        SNR1987A               ACIS-S/HETG
        Radiation Belts                     Sep 24
        MCG-03-58-007          ACIS-S
        2MASSJ00240376+2626    ACIS-S       Sep 25
        Mkn876                 ACIS-S/HETG
        G098.12+30.30          ACIS-I
        IDCSJ1433.2+3306       ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports